Wednesday, October 19, 2011

End of the Trip

                                            Picture of Sparrow at her dock in Mystic Islands, NJ.


Yesterday I sailed Sparrow, with Don Baker along as crew,  up to her Marina. The ride was very nice. The day was beautiful.  We ran up along the coast with sadness watching other sailboats and trawlers heading south. Now that is not quite what I was planning to do this winter. So what happened? It could be said that I bit off more then I could chew, as far as the upgrades I planned for Sparrow. I have to respond that I only bit off what I had to. The problem being that I could not chew fast enough. What I found is that almost any job that you plan to do on a boat is never as straight foward as originally thought. There is always some unforeseen problem that won't appear until you start, and before you know it, a small installation job turns into a big project.
   Sparrow will continue to get her upgrades while wintering at the marina, and next Spring I plan to sail her down through the Chesapeake Bay. Next Fall again I plan to sail her to the Bahamas.
     Enjoy the Winter. Talk to you next Spring.
    George

Friday, October 14, 2011

Update Oct 14, 2011

Great day today. I had a list of things to do once I got to my boat. Feeling that if I finished them I would be satisfied with myself. Well things went so good, no screw ups, that I was able to start installing a second depth finder. Probably the most important instrument on the boat, and if one goes bad and it is the only one one that you have, you are in trouble.My planned departure day was suppose to be tomorrow. Well that ain't going to happen, but I thing that next week I will take the boat out for an over_nighter, test what I have installed and make my decision, as whether to go or not, based on the outcome. BTW my boat is 75 miles from my house. that equates to approx. 3 hours, round trip, travel time each time I go to it. I only wish that my boat was in my back yard. How quickly I would been able to get it in shape. I must say, I think that my good performance today was probably related to the yoga session that I had last night. You know it's really great for both the body and the mind.
  George
 

Tuesday, October 11, 2011

Update Oct 11, 2011

Well, you know, I wish that I could say that all was well, but unfortunately that ain't the case. I awoke this morning feeling a little depressed over Sparrow's progress but went down to the boat and was able to finish off, or at least push ahead with some of the projects. That made me feel pretty good. At the same time though a bilge pump hose sprung a leak. there is a type of hose that they use in the bilge that is very flexible, at least when you first install it, but after a while, a few years, it becomes very stiff and does not like to be flexed. Well I had to do some work on my bilge pump system and , I guess,  flexed  the hose. I finished the job and turned on the bilge pump, only to see water squirting all over the cabin. On investigation I realized that the hose cracked. After repairing it I starting thinking  about all the other things that are going to hell on this my pre-trip preparation . For instance I ordered this special fitting for my RO water system, which took a week and a half to arrive,  in my haste while working at home on some other boat projects, I lost it.  Last night my back up laptop crashed, and doesn't  want to come back. Did I mention that my Iphone drowned? Now I am not sure if all these little setbacks are a way of some higher power trying to tell me something, but as I said before, if I can not take off by Oct 31, then I have to  pull the plug. Trip will be delayed till next year.
   Oh BTW, the Annapolis Sailboat Show was great. So much to see. Lots of good Seminars.
George

Thursday, October 6, 2011

Status Report October 6, 2011

Things are moving along pretty good on Sparrow. Upgrades are on schedule. I have 3, maybe 4 more  items to complete before she is ready to depart. There are some projects that will have to be completed along the trip. No time now. Nothing critical. Today I finished hooking up my water heater. Tested it. I will also have cabin heat at night while at anchor. I plan on going to the Annapolis Sail Boat Show this weekend. There I will be able to pick up last minute equipment, tips and advice. Next week I will be working on finishing up last minute work, and also provisioning the boat.
   I had originally planned on departing on  Oct 15, chances are I will overshoot that date by a week.  I must leave before November.
    Also sorry about no pictures. My Iphone fell into the bilge last week DOA. I just picked up a new camera, so next week I will include photos.

Wednesday, September 28, 2011

Still getting ready. Sept 28,, 2011

As I was working on my boat today, still trying to get it ready for my trip down the Intracoastal Waterway. then over to the Bahamas, I was thinking about all the work that I have done over the last year on Sparrow. I will try to list them so that this blog does not become to wordy

.
- Rebuilt Bow spirit,  This was originally built of Spruce which started to show rot after twenty years. Over the Winter I  rebuilt it using white oak.
- Installed a Newport diesel Heater. Unfortunately this particular project was never completed. Close but no cigar.

- I moved the Main Sheet Track from behind the helm to in front of it.This was a little involved, and I needed some special fittings welded up for me .
-The reason for moving the Main Track was so I could have a Bimini top over my head while at the Helm. So I made the Frame, and the top. Pictures to follow.
- My previous Dodger was the original from the boat when I first bought it. I was not happy with the way it was mounted or the way it looked. So I made a new frame, free standing, plus the Dodger.
- I originally only had 15 gallon water tank on board, I added another 42 gallon water tank. and lots of plumbing.  So now I have 57 gallon capacity.
- I installed a Reverse Osmosis water System to  Sparrow. Now I can make my own fresh water out of sea water.
- I  installed new Electronics. VHF Radio, New GPS, also AIS receiver.
- I am presently installing new Wind, Speed, and Depth Instruments.
-Presently installing a support for my Life Raft. This will be kept on my port side next to the mast shrouds.
- I had also installed, some time previous to the last year, a Compost Toilet. With this toilet I do not have to be concerned about pump outs. No Holding Tank. This toilet uses Peat Moss, and it just about takes care of itself.
I know that there were some other minor items, but can not recall them at present.
Boat work is progressing  pretty good at this time. So if it continues as such, the trip will be on.
George

Sunday, September 25, 2011

Getting Sparrow ready Sept 25, 2011

   Over the last 6 months I have been fevershly working on Sparrow in order to prepare her for the cruise ahead. Several more upgrades have to be made before she can take off. There is a clock ticking on me right now, basically the boat has to be ready, and headed south before the cold weather arrives. If for some reason she is not ready I will have to delay the trip till next year. Bummer, I really don't want to do that. I will keep you informed of progress.


George